[1]
Sun, Z., Liu, X. and Ma, J. 2021. Study on secondary cable adjustment for cable-stayed bridges without back cables. Insight - Civil Engineering. 4, 1 (Dec. 2021), 313. DOI:https://doi.org/10.18282/ice.v4i1.313.